Where Vision Meets Execution
Coleman, Oklahoma ยท Industrial Hemp Processing

The Coleman Hemp Processing Facility.

A full-build industrial hemp processing facility planned near Coleman, Oklahoma, sized to process the harvest from 500 hectares (about 1,235 acres): on-site drying, milling, baling, and bagging, producing three saleable product streams.

Facility at a GlancePlanned
LocationNear Coleman, Oklahoma
Coleman, OK
Processing CapacityHarvest equivalent
500 ha ยท 1,235 ac
SiteFarm, facility, and quarry
About 760 acres
Contract GrowersSeed and fertilizer provided
About 39%
Product StreamsFibre, micronised hurd, hempcrete hurd
3
Local JobsPlanned for Coleman
200 Jobs
5,700 t
Baled bast fibre per year
11,100 t
Micronised hurd per year
11,100 t
Hempcrete hurd per year (about 555,000 bags)
2
Harvest campaigns a year, drying 24/7

Planned annual capacity from the facility engineering model.

The Site

About 760 Acres in Coleman, Oklahoma

The Coleman tract brings the farm, the processing facility, and the quarry together. Fields are being prepared in blocks so the first acreage can be handed to the farm team early.

  • About 750 acres leased for hemp, with new wells and center-pivot irrigation planned
  • About 100 acres reserved for the quarry and existing sand plant
  • First 50 to 100 acres targeted farm-ready within 8 to 10 months of start
  • Full farm-ready handoff targeted at Month 18, around May 2028
  • First spring crop planned on priority acreage
The Quarry and Sand Plant โ†’
Site Readiness TimelineTargets
Months 0 to 3Site control, surveys, soils, water
๐Ÿ“‹
Months 3 to 6Approvals, access, first clearing
๐Ÿšœ
Months 6 to 10First fields drained, watered, handed off
๐ŸŒฑ
Months 10 to 16Earthwork, roads, irrigation by block
๐Ÿ—๏ธ
Month 18Full farm footprint turned over
โœ…
Inside the Facility

Built for Two 24/7 Harvest Campaigns a Year

Two process warehouses of about 21,500 square feet each, with 32.8-foot clear height, plus roofed reception and outdoor storage pads: roughly 104,000 square feet of working footprint.

๐Ÿ”ฅ

Rotary Dryers

Two tri-fuel rotary dryers (natural gas primary) drying around 800 wet tonnes a day during harvest.

โš™๏ธ

Micronisers

Two micronisers with sifting and dust collection producing fine hurd for bioplastics.

๐Ÿ”จ

Hammer Mills

Two hammer mill systems producing coarse-cut hurd for hempcrete.

๐Ÿ“ฆ

Automated Bagging

Two automated bagging, palletising, and wrapping lines running 24/7 through each campaign.

Engineering figures are from the current facility model and remain subject to final design, utility, and permitting confirmation.

Coleman, Oklahoma Hemp Industry Hub infographic
The Hub

An Entire Industry Around One Facility

Growers, textile and automotive manufacturers, bioplastics, hempcrete and building products, cement and aggregates, testing, logistics, warehousing, equipment services, and workforce training, all connected to Coleman.

What Happens On Site

From Field to Finished Product at Coleman

Every step from harvested stalk to saleable product happens on the property, keeping value, jobs, and income in Oklahoma.

Receive and Dry

Hemp from the project farm and neighbouring growers is received and dried on site.

Separate and Mill

Stalks are separated into bast fibre and hurd, then hammer-milled and micronised.

Bale and Bag

Fibre is baled; hurd is bulk-bagged in fine and coarse grades.

Ship

Boxley Dispatch and its carriers truck finished products to rail, ports, and buyers.

Three Saleable Streams

What the Coleman Facility Produces

Hemp bast fibre twine and fabric
Stream 1

Baled Bast Fibre

The long outer fibre of the stalk, baled for textiles, nonwovens, and natural-fibre composites.

Micronised hemp hurd powder
Stream 2

Micronised Hurd

The woody inner core, finely micronised for bioplastics and biocarbon: grown, not drilled.

Coarse-milled hemp hurd for hempcrete
Stream 3

Coarse-Milled Hurd

Dried, coarse-milled, and bulk-bagged hurd: feedstock for hempcrete, a low-carbon insulation and building material.

Buyers and Offtake Partners

Who Buys What Coleman Makes

We are seeking letters of intent and offtake agreements so every bale and bag has a buyer as it is produced, and we invite these companies to buy or lease property in the Coleman area.

Baled Bast Fibre

Fibre Buyers

  • Textile mills
  • Apparel brands
  • Automotive suppliers (composites and interior panels)
  • Furniture manufacturers
Micronised Hurd

Hurd and Bioplastic Buyers

  • Bioplastic compounders
  • Packaging manufacturers
  • Automotive suppliers (molded parts)
Hempcrete Hurd

Building-Material Buyers

  • Hempcrete manufacturers
  • Insulation companies
  • Building-material distributors
  • Construction companies

๐Ÿค Are you a buyer?

Textile, automotive, furniture, bioplastics, packaging, apparel, insulation, hempcrete, building-material, and construction companies: talk to us about supply, letters of intent, and buying or leasing property near Coleman.

Manufacturers We Need โ†’

๐Ÿšš Logistics by Boxley Dispatch

Boxley Dispatch, Kendrick Freight Transport (53-ft dry van), and AEON Medical Transport (box trucks) move Coleman products to rail, to the ports, and directly to buyers.

Logistics Partners โ†’
Prosperity for Coleman

200 Jobs Planned for Coleman, Oklahoma

The Coleman project is planned to bring 200 jobs to the area across farming, processing, the academy campus, and the trades that build and maintain it all.

๐ŸŒพ

Farm and Field

Planting, irrigation, harvest, and equipment crews on the project farm and with neighbouring growers.

๐Ÿญ

Processing Plant

Drying, milling, baling, bagging, maintenance, quality, and logistics roles at the facility.

๐ŸŽ“

Youth Academy

Counselors, teachers, welding and trades instructors, farm staff, and administration.

๐Ÿ› ๏ธ

Construction and Trades

Building the facility, campus, and workforce housing with a trained local workforce.

Job figures are planning targets and depend on project financing, construction, and licensing.

Contract Growers Wanted

Farm Hemp on Your Land. We Provide the Seed and Fertilizer.

We are looking for Oklahoma farmers who have land and can farm industrial hemp for the Coleman facility. You farm your ground; we provide the seed and fertilizer, the agronomy plan, and a buyer for your harvest.

  • Seed and fertilizer provided by the project
  • Agronomy support built on the Hi Tech Ag system
  • A local buyer at the Coleman processing facility
  • Short haul to on-site drying and processing
  • Work for local planting and harvest crews
Contract Grower ProgramSigning Growers
You ProvideYour land, equipment, and farming
๐Ÿšœ
We ProvideSeed, fertilizer, and agronomy
๐ŸŒฑ
We BuyYour harvest, delivered to Coleman
๐Ÿญ
Grower ShareOf the facility's annual feedstock
About 39%

Industrial hemp only (0.3% THC or less), grown under ODAFF licensing. Terms set in individual grower agreements.

Coleman Questions

The Coleman Hemp Processing Facility

Where is the hemp processing facility?

Near Coleman, Oklahoma, on approximately 750 leased acres that also serve as the project farm.

How much hemp will the Coleman facility process?

It is sized to process the harvest equivalent of 500 hectares, about 1,235 acres.

What products will it make?

Three saleable streams: baled bast fibre, micronised hurd for bioplastics and biocarbon, and dried, coarse-milled, bulk-bagged hurd used as hempcrete feedstock.

How many jobs will the Coleman project create?

The Coleman project is planned to bring 200 jobs to the area across farming, processing, the Viviscent Youth Academy campus, and construction and trades. Figures are planning targets.

Who will buy the products from Coleman?

The project is seeking letters of intent and offtake agreements from textile mills, automotive suppliers, furniture manufacturers, bioplastic compounders, hempcrete manufacturers, insulation companies, building-material distributors, packaging manufacturers, apparel brands, and construction companies.

Can I grow hemp for the Coleman facility?

Yes. We need farmers who have land and can farm hemp. We provide the seed and fertilizer, and about 39% of the facility's feedstock is planned to come from contract growers.

When will the first crop be planted?

The site plan targets the first 50 to 100 acres farm-ready within 8 to 10 months of start and full farm readiness around May 2028, with a first spring crop on priority acreage.

Grow, Supply, or Partner at Coleman

Growers, equipment suppliers, buyers of fibre and hurd, offtake partners, and local partners: contact Kevin Edmundson at kevin@viviscent.org or (877) 671-6244.